PROCEDURE FOR OPERATION OF DISPENSING BOOTH FOR THE RAW & PACKING MATERIAL

  • OBJECTIVE:
  • To lay down the procedure for operation of dispensing booth for the raw and packaging material.
  • SCOPE:
  • This SOP is applicable for the operation of dispensing booth for the raw and packaging material at {Company Name} {Location}.
  • RESPONSIBILITY:
  • WH Executive/Designee – shall be responsible to follow the procedure as per SOP.
  • Head Warehouse is responsible for compliance of the SOP.
  • ACCOUNTABILITY:

  QA Head shall be Accountable for implementation of SOP.

  • PROCEDURE:
  • OPERATION OF LAF:
    • The dispensing booth and room should be cleaned prior to the start of dispensing activity daily.
    • Verify the Preventive Maintenance Status of LAF.
    • Ensure the cleanliness of side panels, grills and balance wherever applicable.
    • Ensure minimum items should be stored under the LAF as required for dispensing.
    • Ensure AHU of dispensing room is switched “ON” at least 30 minutes prior to commencement of the operations.
    • Do not open the container inner pack outside the safe working zone.
    • Switch on the LAF station, and light switches of Dispensing booth wherever applicable.
    • Wait for 15 minutes after switching on the LAF station to stabilize the system prior to start the dispensing activity and record the LAF switched on time in the Format.
    • Check the 10.0µ, 5.0µ & HEPA (0.3µ) filter pressure differentials indication level and record the filter pressure differentials.
    • Limits of LAF:

10 µ (Pre Filter) – 1 to 4 mm of WC

5.0 µ (Fine Filter) – 4 to 10 mm of WC

0.3 µ (HEPA) – 10 to 25 mm of WC

  • In case of any power failure/LAF breakdown, stop the activity and inform to the Engineering Department, after rectification once again take Line Clearance from IPQA and start the Dispensing.
  • After ensuring required environment conditions and Differential Pressure of Dispensing area/LAF are within the specified limits.
    • The Warehouse Executive/Designee shall ensure that the material, which is going for dispensing, shall be placed at respective designated area.
    • Run the LAF station till dispensing is completed, and then switch “OFF” LAF station and record in the Format.
  • REFERENCES:

Not Applicable

  • ANNEXURES: 
ANNEXURE NO.TITLE OF ANNEXURE
Annexure-IUsage and cleaning record of Dispensing Booth & Room in Warehouse

ENCLOSURES: SOP Training Record.

  •  DISTRIBUTION:
  • Controlled Copy No. 01  :    Head Quality Assurance
  • Controlled Copy No. 02  :    Head Warehouse
  • Master Copy                    :    Quality Assurance Department
  • ABBREVIATIONS:
No.:Number
SOP:Standard Operating Procedure
QA:Quality Assurance
LAF:Laminar Air Flow
AHU:Air handling unit
WC:Water Content
  • REVISION HISTORY:              

CHANGE HISTORY LOG

Revision No.Details of ChangesReason for ChangeEffective Date
00New SOPNot ApplicableTo Be Written Manual

Annexure-I
USAGE AND CLEANING RECORD OF DISPENSING BOOTH & ROOM IN WAREHOUSE

1. What are the key steps involved in preparing the LAF for dispensing activity?

Answer: The key steps include:

  • Cleaning the dispensing booth and room
  • Verifying the LAF’s preventive maintenance status
  • Ensuring cleanliness of side panels, grills, and balance
  • Minimizing items stored under the LAF
  • Switching on the dispensing room’s AHU 30 minutes prior
  • Waiting 15 minutes after switching on the LAF to stabilize

2. What are the acceptable pressure differential ranges for the LAF filters?

Answer:

  • 10 µ (Pre Filter): 1 to 4 mm of WC
  • 5.0 µ (Fine Filter): 4 to 10 mm of WC
  • 0.3 µ (HEPA): 10 to 25 mm of WC

3. What actions should be taken in case of a power failure or LAF breakdown?

Answer:

  • Stop dispensing activity immediately
  • Inform the Engineering Department for rectification
  • Obtain line clearance from IPQA before restarting
  • Ensure environmental conditions and pressure differentials are within limits before restarting

4. Who is responsible for ensuring materials are placed in the designated area for dispensing?

Answer:

  • The Warehouse Executive/Designee

5. When should the LAF station be switched off?

Answer:

  • After dispensing is completed
Share this article
Shareable URL
Prev Post

PROCEDURE FOR DISPENSING OF ACTIVE MATERIAL IN ISOLATOR

Next Post

PROCEDURE FOR HANDLING OF REJECTED/EXPIRED MATERIALS

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading