- OBJECTIVE:
To lay down a procedure for Entry and Exit at Purified water system.
- SCOPE:
This SOP is applicable for Entry and Exit at Purified water system at {Company Name} {Company Location}.
- RESPONSIBILITY:
- Technical Assistant –Engineering shall follow the procedure for Entry and Exit to the Purified water system.
- Executive – Engineering shall ensure the compliance as per SOP.
- ACCOUNTABILITY:
Engineering Head
Head Quality Assurance
- PROCEDURE:
- Entry Procedure
- Enter in to the change room.
- Leave your street footwear in the designated place.
- Wear the primary foot wear which was kept in the designated place.
- Enter into the water system room.
- Exit Procedure
- Exit from the plant room and enter the change room.
- Remove the Primary footwear and keep in designated place.
- Wear street footwear.
- Exit from the change room.
Note: Shoe covers shall be provided for visitors.
- REFERENCES:
Not Applicable
- ANNEXURES:
Not Applicable
ENCLOSURES: SOP Training Record.
- DISTRIBUTION:
- Controlled Copy No. 01 Head Quality Assurance
- Controlled Copy No. 02 Head-Engineering
- Master Copy Quality Assurance Department
- ABBREVIATIONS:
SOP : Standard Operating Procedure.
- REVISION HISTORY:
CHANGE HISTORY LOG
Revision No. | Details of Changes | Reason for Change | Effective Date |
00 | New SOP | Not Applicable | To be written manual |