- OBJECTIVE:
- To lay down the procedure for operation of Cyclomixer. Make: IKA
- SCOPE:
This SOP is applicable to the procedure for Operation of Cyclomixer. Make: IKA at {Company Name} {Location}.
- RESPONSIBILITY:
- Officer/Executive/Designee Quality Control – Shall be responsible for operation as per SOP.
- Head/Designee Quality Control – Shall be responsible for ensuring compliance as per SOP.
- ACCOUNTABILITY:
QA Head shall be Accountable for implementation of SOP.
- PROCEDURE:
- Ensure that the instrument is clean and free from dust.
- Set up the cyclo mixer in a spacious area on an even, stable, non-slip and fire proof surface. Switch “ON” the mains
- Note: Ensure that the power cord is connected to the power socket.
- Place the Volumetric flask or test tube containing a mixture of sample which shall be mixed on vibrator.
- Select the mode of operation Direct on/Load.
- Direct on: By this the vibrator will start directly & the regulator can control speed
- Load: By this means the unit will start only when the rubber top is loaded by tube with gentle press on the rubber top.
- Position the knob desired mode and gradually increase the speed by rotating the knob clockwise.
- If the shaking movement of the mixer increases (resonance), reduce the speed or pass through the critical phase as quickly as possible.
- Reduce the speed by using rotating the knob anti clockwise if
- The medium splashes out of the vessel because the speed is too high.
- The mixer is not running smoothly.
- After completion of mixing switch “OFF” the mains.
- Precautions:
- Keep the sample containers as vertical as possible.
- Do not operate the appliance in an explosive atmosphere, with hazardous substances or under water.
- Always disconnect the plug before fitting the accessories.
- Position one single shaking vessel in the center and several shaking vessels so that they are evenly spread out.
- The appliance is not suitable for manual operation.
- REFERENCES:
Not Applicable
- ANNEXURES:
Not Applicable
ENCLOSURES: SOP Training Record.
- DISTRIBUTION:
- Controlled Copy No. 01 : Head Quality Assurance
- Controlled Copy No. 02 : Head Quality Control
- Master Copy : Quality Assurance Department
- ABBREVIATIONS:
No. | : | Number |
SOP | : | Standard Operating Procedure |
QC | : | Quality Control |
- REVISION HISTORY:
CHANGE HISTORY LOG
Revision No. | Details of Changes | Reason for Change | Effective Date |
00 | New SOP | Not Applicable | To Be Written Manual |