Your Compass for Pharma Success

PROCEDURE FOR CODING OF SCREENS, MESHES, FBP BAGS AND BELLOWS

  • PROCEDURE FOR CODING OF SCREENS, MESHES, FBP BAGS AND BELLOWS:
  • Check integrity of screen / mesh & FBP bags before coding.
  • Incase any discrepancy observed inform QA by raising NCR as per SOP and shall be investigated.
  • Coding shall be done to the Screen, Mesh, FBP bag & Bellows which has passed the Integrity Test.
  •       CODING OF MULTI MILL/CONE MILL SCREENS:
  • The coding for the screen will be given as PD/XX/YY/NN.

    Where,

    · PD :- Production department

    · XX: – Mill Type. For Cone Mill the code shall be CO, for multi mill the code shall be MM

    · YY: – Screen Size.

    ·       NN: – Serial number starting from 01, 02.. and so on.

    • For example, for the first 1.0 MM screen of Multi mill, the coding will be as PD/MM/1.0 /01.
    • For example, for the first 1.0 MM screen of cone mill, the coding will be as PD/CO/1.0 /01.
    • CODING OF MESHES:

    The coding for the mesh will be given as per PD/SFT/XX/YY/NN.

    Where,

    · PD: – Production department

    · SFT: – Sifter

    · XX: – Size of sifter

    · YYY: – Sieve size

    · NN: – Serial number starting from 01,02.. and so on.

    • For example, First sieve of 20 mesh of 12 inch diameter Sifter the coding shall be done as PD/SFT/12/20/01.
    • The first mesh of 20 mesh of 30 inch diameter coding will be PD/SFT/30/20/01.
    • CODING OF FBP BAGS:
    • The FBP bags name shall be coded as Product name with embroyding
    • CODING OF BELLOWS:

                    The Bellows name shall be coded as Product name with embroyding.

    • ABBREVIATIONS:
    PD:Production
    FBP:Fluid Bed Processor
    NCR:Non Conformance Report
    No.:Number
    SOP:Standard Operating Procedure
    Share this article
    Shareable URL
    Prev Post

    OPERATION OF LIFTING & POSITIONING DEVICE

    Next Post

    OPERATION OF AUTOMATIC TABLET COATING MACHINE (SEJONG-SFC-100FH & SFC-130 FH)

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    Read next

    CLEANING OF MIST SHOWER

    No. : Number SOP : Standard Operating Procedure Revision No. Details of Changes Reason for Change Effective Date…

    Discover more from PharmaGuideHub

    Subscribe now to keep reading and get access to the full archive.

    Continue reading