Your Compass for Pharma Success

Preventive Maintenance Check List of Dehumidifier

In pharmaceutical applications, a dehumidifier plays a crucial role in maintaining a controlled environment, ensuring the quality and stability of products. By removing excess moisture from the air, dehumidifiers prevent mold growth, bacterial contamination, and degradation of sensitive materials. In cleanrooms, laboratories, and storage areas, dehumidifiers help maintain a relative humidity (RH) level between 30-60%, as required by regulatory standards.

Preventive Maintenance Check List of Dehumidifier:

Department: Engineering         Equipment Name: Dehumidifier         Equip. No./ID:                             Frequency: Quarterly
S. NoCheck PointsProcedureActivityDone By / Date
  1.Check the AHU and dehumidifier damper Position.By physical verification of the AHU and dehumidifier damper as per standard marking.  
  2.Check the condition of all the access panels’ gasket.By Physical verification of the panel gasket and if found worn out replace the same.  
  3.Check the condition of the Desiccant bedBy Physical verification, if found dust accumulation clean with bed with low pressure air  
  4.  Check all the rotating parts and accessoriesObserve the rotation of the chain/belt, if found improper rotation then adjusts the chain/belt with a suitable tool.  
  5.  Check the gear motor and gear box bearingsPhysically observe for any abnormal sound and also observe the motor end covers for hot. If observed any of these abnormalities bearings shall be replaced.  
  6.Check the seal which separates the process compartment from the reactivation compartmentBy physical verification of the seal and if seal found not in alignment, align the same.  
  7.Check the condition of all the access panels’ gasket.By Physical verification of the panel gasket and if found worn out replace the same.  
  8.Check all the bolts and nuts of the cover.By physical verification if found any bolts mis   sing the same shall be replaced   
9.Check the reactivation air and process air filtersBy physical verification if found filter chock clean with compressed air.  
  10.Check the terminals of the heater bank.By physical verification, if found loose tighten or found burnt wire replace the same.  
11.Clean the Control panelClean with Vacuum cleaner and ensure that the panel is cleaned thoroughly.  
12.Ensure the earthing of motor.Check the earthing wires for proper connection.
  13.Check & tighten the motor terminals, control wiring terminals, indication lamps and OLR setting  Physical verification and loosen wires shall be tightened with tester.
  14.Check the Motor Voltage and Amperage and heaters amperesBy using a Clamp meter ensure that they are within the acceptable Limit with respect to motor rating.  
Remarks:     Checked By / Date

Share this article
Shareable URL
Prev Post

Preventive Maintenance Checklist of Cold Storage System (2-8°C)

Next Post

Batch Size Calculation in Pharmaceutical Industry

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

OPERATION OF ANEMOMETER

Revision No. Details of Changes  Reason for Change Effective Date 00 New SOP Not Applicable To be written manual

AHU PARAMETER MONITORING

To lay down a procedure for AHU Parameter monitoring. This SOP is applicable for AHU Parameter monitoring at…

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading