PREPARATION, NUMBERING, REVIEW, APPROVAL, ISSUANCE AND CONTROL OF LAYOUTS

  • PROCEDURE:
  • Layouts shall be prepared for the following but not limited to
  • PROCEDURE:
  • Layouts shall be prepared for the following but not limited to
  • Facility Layout
  • Equipment Layout
  • Utilities layout (like HVAC, Water System, Compressed Air System)
  • Facility Layout includes the following but not limited to
  • Site layout
  • Different Area/section/ modules
  • Man Movement layout.
  • Material Movement layout
  • Drain Point Location layout.
  • Pest and Rodent control layout
  •     Equipment layout includes the following but not limited to
  • Location of equipment in area.
  • Schematic arrangement of the equipment
  • Utility layout includes the following but not limited to
  • Schematic arrangements of AHU, dust collector
  • Duct layout, grill layout.
  • Pressure Gradient layout, AHU Zoning layout, Area classification layout, P&ID of Water or Compressed Air Systems, AHU Schematic drawing.
  • Piping and Instrumentation diagram
  •   Preparation of layout
  • Engineering / Project department shall prepare the draft copy of layout A3 or A4 as per the format detailed in Annexure-II in consultation with user department layouts depicting only the outline of facility, rooms shall indicate the scale and the units.
  • Any short forms, diagrammatic representations, colour codes shall be explained in the layouts.
  • Engineering /project department shall put ‘DRAFT COPY’ stamp and shall circulate to the  technical/user departments and QA for review.
  • Upon receipt of draft copy, the reviewer shall review and send comments to the Engineering/Project department for incorporating the same in the final layout.
  • After incorporation of suggestion(s) as applicable, print of layout (QA copy, Display copies as applicable & Site Master File copy as applicable) shall be taken and shall be forwarded for signatures from Technical/User department and final approval from Plant QA In-charge or designee.
  • Engineering / Project department shall destroy the draft copy by shredding after the approval of the layout as per Annexure-II
  • In case of additional original copy, reprint shall be taken and shall be reviewed by Technical/User department and approved by Plant QA In-charge.
  • The layouts prepared by external consultants shall be verified and shall be numbered as detailed in section
  • Engineering / Project department shall do the verification and approval.
  • All approved layouts shall be maintained as per Annexure-I. (List of layouts).
  •       Issuance of layouts
  • Approved layout copies shall be submitted to QA for issuance of the same.
  • Documentation person shall enter the layout number and name in the logbook as detailed in Annexure-III.
  • User department shall raise document Requisition/Distribution slip, get it approved by Plant QA In-charge or designee.
  • QA shall issue the Photocopy of the layout as a DISPLAY copy and shall take the Signature of the receiver in the logbook.
  • In case, the layout is required to be issued to external agencies, regulatory bodies, customers, additional original copy, reprint shall be taken and shall be reviewed by Technical/User department and approved by Plant QA In-charge or Photocopy of QA copy or SMF copy shall be taken and issued with stamp Reference copy – Not for operational use.
  • Revision of Layouts
  • The existing layout, if revised, due to any changes/modification in the facility or system or equipment location, then Initiator department shall raise the change control with necessary justification.
  • After approval of the Change Control, Layout shall be revised, and the changes shall be recorded in the change history as per Annexure-IV.
  • All the existing controlled copies of layout shall be retrieved and forwarded to QA by concerned department(s).
  • Upon receipt of the retrieved copy, QA shall record and destroy the retrieved copy (ies) by shredding and maintain the record for the same.
  • QA copy of the layout shall be maintained by putting the stamp “OBSOLETE” in red on the layout and filed separately.
  • Plant QA shall control, issue, and retrieve the layouts and maintain records.
  •      Numbering of layouts
  •     A unique number shall be assigned for layouts.
  •    AAA/BBB/C/NNN-XX
  • AAA: Indicates Company name abbreviations.
  • BBB: Indicate Layout
  • C: Indicates for if facility layout the Facility Layout denotes as “F” , `E` for Equipment layout  `U` for Utility layout
  • NNN: Indicates serial no of layout start from 001,002, 003……
  • XX: Indicates version number of layout starting from 00 and continuing serially in increments of one unit.
  • For e.g. the facility layout no shall be given as AAA/LYT/F/001-00
  •    There shall be separate series for each type of layout i.e. Facility, Equipment and Utility.
  • REFERENCES:
  •   Not Applicable
  • ANNEXURES: 
  ANNEXURE No.TITLE OF ANNEXURE
Annexure-IList of Layouts
Annexure-IIFormat of Layout
Annexure-IIILayout Control Record
Annexure-IVChange History Sheet
  • ENCLOSURES: SOP Training Record.
  • DISTRIBUTION:
  • Controlled Copy No. 01                     Head Quality Assurance
  • Controlled Copy No. 02                 Head-Engineering
  • Master Copy                           Quality Assurance Department
  • ABBREVIATIONS:
  • P&I          :          Piping and Instrumentation
  • HVAC     :          Heating Ventilation and Air-conditioning
  • AHU        :          Air Handling Unit
  • QA            :           Quality Assurance
  • REVISION HISTORY:
  •  CHANGE HISTORY LOG
Revision No.Details of Changes Reason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual

Annexure-I
LIST OF LAYOUTS

LIST OF LAYOUTS

Annexure-II
FORMAT OF LAYOUT

FORMAT OF LAYOUT

Annexure-III
LAYOUT CONTROL RECORD

Annexure-IV
CHANGE HISTORY SHEET

Share this article
Shareable URL
Prev Post

CALIBRATION OF LINOMAT 5 TLC SPOTTER (MAKE: CAMAG)

Next Post

OPERATION PROCEDURE OF DUST COLLECTOR

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

BUILDING MAINTENANCE

Building maintenance in the pharmaceutical industry is critical due to stringent regulatory requirements and the…
BUILDING MAINTENANCE

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading