Your Compass for Pharma Success

OPERATION OF COOLING TOWER

  • PROCEDURE:
  •  PRECAUTIONS:
  • Check the cooling tower water level which should be above half level, if needed fill with water.
  • Ensure that the suction and delivery valves of cooling water pump are open.
  • Check the Main power supply is available.
  • Check for any abnormal noise in the fan, motor, drive shaft and  gear reducer.  
  • STARTING PROCEDURE:
  • Switch on the input power supply of the cooling tower pumps.
  • Start the cooling tower pumps.
  • Start the cooling tower fans.
  • Record readings as per enclosed Annexure-I.
  • STOPPING PROCEDURE:
  • Switch off the Cooling tower pumps.
  • Switch off the cooling tower fans.
  • Record readings as per enclosed Annexure-I.
  • REFERENCES:
  •   Not Applicable
  • ANNEXURES: 
ANNEXURE No.TITLE OF ANNEXURE
Annexure-ICooling Tower Log Sheet
  • DISTRIBUTION:
  • Controlled Copy No. 01                     Head Quality Assurance
  • Controlled Copy No. 02                 Head-Engineering
  • Master Copy                           Quality Assurance Department
  • ABBREVIATIONS:
  •   SOP                               :          Standard Operating Procedure
  • REVISION HISTORY:
  •    CHANGE HISTORY LOG
Revision No.Details of ChangesReason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual

Annexure-I
COOLING TOWER LOG SHEET

COOLING TOWER LOG SHEET
Share this article
Shareable URL
Prev Post

OPERATION OF DEHUMDIFIER

Next Post

OPERATION OF ANEMOMETER

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading