Your Compass for Pharma Success

OPERATION OF COOLING TOWER

  • PROCEDURE:
  • Precautions:
  • Check the cooling tower water level which should be above half level, if need fill with softener water.
  • Ensure that the suction and delivery valves of cooling water pump are open.
  • Check the Main power supply is available.
  • Check for any abnormal noise in the fan, motor, drive shaft and gear reducer.
  • Starting Procedure:
  • Switch on the input power supply of the cooling tower pumps.
  • Start the cold water circulation pumps one by one based on plant load.
  • Start the cooling tower fans.
  • Record readings as per Annexure-I.
  •  Stopping Procedure:
  • Switch off the cold water circulation pumps.
  • Switch off the cooling tower fans.
  • Record readings as per enclosed Annexure-I.
  • REFERENCES:
  •    Not Applicable
  •    ANNEXURES: 
ANNEXURE NO.TITLE OF ANNEXURE
Annexure-ICooling tower Log Sheet
  • ENCLOSURES: SOP Training Record.
  •  DISTRIBUTION:
  • Controlled Copy No. 01  :          Head Quality Assurance
  • Controlled Copy No. 02  :            Head Engineering
  • Master Copy                    :          Quality Assurance Department
  • ABBREVIATIONS:
No.:Number
SOP:Standard Operating Procedure
SHE:Safety and health environment
AHU:Air Handling Unit
RC:Running Continually
  • REVISION HISTORY:             
  • CHANGE HISTORY LOG
Revision No.Details of ChangesReason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual

Annexure-I
COOLING TOWER LOG SHEET

COOLING TOWER LOG SHEET
Share this article
Shareable URL
Prev Post

OPERATION OF SMOKE GENERATOR

Next Post

OPERATION OF SOUND LEVEL METER

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading