Your Compass for Pharma Success

OPERATION OF GARMENT CUBICLE

  • OBJECTIVE:
  • To lay down a procedure for operation of Garment Cubicle.
  • SCOPE:
  • This SOP is applicable to the procedure for operation of Garment Cubicle at {Company Name} {Location}.
  • RESPONSIBILITY:
  • Officer/Executive/Designee (QC) Micro. – Shall be responsible to follow the procedure as per SOP.
  • Head/Designee Quality Control – Shall be responsible for ensuring compliance as per SOP.
  • ACCOUNTABILITY:
  • QA Head shall be Accountable for implementation of SOP.
  • OPERATING PROCEDURE OF GARMENT CUBICLE:
  • A garment cubicle is a specialized type of cabinet designed for storing garments, particularly in controlled environments.
GARMENT CUBICLE
  • Switch ON the main power supply.
  • There are six switches at the right side panel of the instrument:
  • Switch (1&2) for air Flow – LAF – ‘ON & OFF’Switch (3&4) for light – LUX – ‘ON & OFF’Switch (5&6) for UV light – ‘UV’ – ‘ON & OFF’
  • Switch on the Air flow and UV for at least 30 min before use to stabilize.
  • When loading or unloading the garments put off the UV switch.
  • Put on the Drying Switch for some time after keeping the garment to remove any moisture content.
  • Switch ‘OFF’ the power at the end of the day after use.
  • Maintain a record for UV lamp consumed every day and maintain the initial burning capacity (usually 2000 hrs.) of the lamp or as mentioned by the manufacturer.

Click the link for download word file copy of this document:
https://pharmaguidehub.com/product/operation-of-garment-cubicle/

  • ANNEXURES: 
Annexure No.Title of annexure
Annexure-IGarment Cubicle UV Lamp burning hours record

ENCLOSURES: SOP Training Record.

  •  DISTRIBUTION:
  • Controlled Copy No. 01  :          Head Quality Assurance
  • Controlled Copy No. 02  :         Head QC (Micro.)
  • Master Copy                    :          Quality Assurance Department
  • ABBREVIATIONS:
No.:Number
LAF:Laminar Air Flow
SOP:Standard Operating Procedure
QC:Quality Control

REVISION HISTORY:            

CHANGE HISTORY LOG
Revision No.Details of ChangesReason for ChangeEffective Date
00New SOPNot ApplicableTo Be Written Manual

Annexure-I
GARMENT CUBICLE UV-LAMP BURNING HOURS RECORD

GARMENT CUBICLE UV-LAMP BURNING HOURS RECORD

Click the link for download word file copy of this document:
https://pharmaguidehub.com/product/operation-of-garment-cubicle/

Share this article
Shareable URL
Prev Post

OPERATION OF LAMINAR AIR FLOW

Next Post

RECEIPT, STORAGE AND HANDLING OF MICROBIOLOGICAL CULTURE MEDIA

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

OPERATION OF DENSIMAT

Densitometry in the pharmaceutical industry is a technique used to measure the density of substances, often in…
OPERATION OF DENSIMAT

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading