- PROCEDURE:
- Precautions:
- Check the service door it should be in closed condition before starting the exhaust unit.
- Check the damper position as per standard marking, if not in proper position adjust it.
- If global exhaust unit is connected with AHU’s, first switch on the AHU and Global Exhaust unit.
- Switch on the High pressure area AHU’s first followed by the low pressure areas in case of power resume after power failure as per below mentioned.
- Starting:
- Start Exhaust unit Blower Motor by pressing the start push button.
- Observe for any abnormal sound or vibrations.
- If Global exhaust unit runs continuously, put ‘RC’ in ON time column of log sheet.
- Stopping:
- Stop the Global exhaust unit Blower Motor by pressing stop push button.
- Record the activity in Annexure-I.
- If Global exhaust unit runs continuously, put ‘RC’ in OFF time column of log sheet.
- Frequency of Global exhaust unit Operation:
- Whenever the area is in operation.
- Whenever performed preventive maintenance activity and filter cleaning activity the same shall be recorded in the remarks column of Annexure-I.
- Record the activity in Annexure-I.
- REFERENCES:
- Not Applicable
- ANNEXURES:
ANNEXURE NO. | TITLE OF ANNEXURE |
Annexure-I | Global Exhaust unit Log Sheet |
- ENCLOSURES:
- SOP Training Record.
- DISTRIBUTION:
- Controlled Copy No. 01 : Head Quality Assurance
- Controlled Copy No. 02 : Head Engineering
- Master Copy : Quality Assurance Department
- ABBREVIATIONS:
No. | : | Number |
SOP | : | Standard Operating Procedure |
- REVISION HISTORY:
- CHANGE HISTORY LOG
Revision No. | Details of Changes | Reason for Change | Effective Date |
00 | New SOP | Not Applicable | To be written manual |
Annexure-I
GLOBAL EXHAUST UNIT LOG SHEET