- OBJECTIVE:
- To lay down a procedure for Operation of Muffle furnace in Quality Control laboratory.
- SCOPE:
This SOP is applicable to procedure for Operation of Muffle furnace in Quality Control laboratory at {Company Name} {Location}.
- RESPONSIBILITY:
- Officer/Executive/Designee Quality Control – Shall be responsible for operation as per SOP.
- Head/Designee Quality Control – Shall be responsible for ensuring compliance as per SOP.
- ACCOUNTABILITY:
QA Head shall be Accountable for implementation of SOP.
- PROCEDURE:
- Muffle furnace: A muffle furnace is a type of furnace that heats materials to high temperatures while isolating them from the fuel and combustion byproducts. This isolation is achieved through a chamber, often made of refractory materials like ceramic or brick, that surrounds the heating element and the material being heated.
- Check that the working area is clean.
- Open the door of Muffle furnace and ensure that it is clean from inside.
- Close the door of the Muffle furnace.
- Connect the power cord to mains and switch on the main provided on left side of the instrument.
- Digital display will show the temperature inside the muffle furnace.
- Set the required temperature by pressing the ‘Push to set’ key and by up and down arrows.
- Place the sample weighed in platinum crucible or silica crucible as required with the help of tongs and close the door.
- After completion of the test switch off the mains and remove the sample.
- Enter the details of usage in logbook.
- REFERENCES:
Not Applicable
- ANNEXURES:
ANNEXURE NO. | TITLE OF ANNEXURE |
Annexure-I | Muffle Furnace logbook |
ENCLOSURES: SOP Training Record.
- DISTRIBUTION:
- Controlled Copy No. 01 : Head Quality Assurance
- Controlled Copy No. 02 : Head Quality Control
- Master Copy : Quality Assurance Department
- ABBREVIATIONS:
No. | : | Number |
°C | : | Degree centigrade |
ID | : | Identification |
SOP | : | Standard Operating Procedure |
QC | : | Quality Control |
- REVISION HISTORY:
CHANGE HISTORY LOG
Revision No. | Details of Changes | Reason for Change | Effective Date |
00 | New SOP | Not Applicable | To Be Written Manual |
Annexure-I
Muffle Furnace logbook