Ensure that the station is ON and Normal display is showing.
Insert the docket or any applicable items in to the carrier and close it properly.
Insert the Carrier in to the tube and make sure that the carrier opening is at top Side.
Leave the carrier in to the inlet tube connected to the station.
Dial the destination number on the display station as per the Annexure-I and wait for a few seconds.
Observe that the carrier shall be move aside and pulled by the main conveying tube to send it to the destination.
Check with the other end to ensure the docket/applicable item reached.
OES Functions indicators are as per the Annexure-II. Observe the OES Function Indicators if any abnormal function alert observed inform the Engineering department through Breakdown request as per the SOP.