Your Compass for Pharma Success

PERFORMACE QUALIFICATION PROTOCOL OF COLD CHAMBER

PERFORMACE QUALIFICATION PROTOCOL OF COLD CHAMBER

A cold storage chamber is a specially designed facility or room that maintains a low temperature to store pharmaceuticals material , and other temperature-sensitive materials. This controlled environment helps to slow down spoilage, maintain quality, and extend the shelf life of products.

Objective of Performance Qualification:

The objectives of this Performance Qualification (PQ) are as follows:

  • To verify that the equipment performs in accordance with set acceptance criteria and complies with cGMP requirements.
  • To demonstrate that the system will perform consistently within its operating range.

Following execution of the protocol, a validation report will be written and approved.  All results, conclusions and variances will be addressed and final disposition of the equipment will be stated. Successful completion of this protocol and approval of the performance qualification report will verify that cold chamber supplied by M/s. Cold Star Refrigeration and installed in quality control department meets all the acceptance criteria and is ready for its intended use.

Performance qualification

The performance qualification of cold chamber shall be performed by doing following tests.

  • Empty chamber heat distribution study (Single day)
  • Partial loaded chamber heat penetration study (Three consecutive days)
  • Full loaded chamber heat penetration study (Three consecutive days)
  • Door open and door close study (for information only)
  • Power outage test (for information only)

Find the below detailed protocol:

Key Parameter of Below Page:

Table of content

Find below pages for complete protocol:

Key Parameter of Below Page:

Protocol Approval

Find below pages for complete protocol:

Key Parameter of Below Page:

Overview

  • Objective
  • Scope
  • Responsibility

Find below pages for complete protocol:

Key Parameter of Below Page:

Frequency of qualification

  • Performance qualification
  • Performance re-qualification criteria

Methodology

  • Equipment and material
  • Test Procedure

Find below pages for complete protocol:

Key Parameter of Below Page:

Partial loaded chamber heat penetration study

Find below pages for complete protocol:

Key Parameter of Below Page:

  • Full loaded chamber heat penetration study
  • Door open and door closure study

Find below pages for complete protocol:

Key Parameter of Below Page:

  • Power outage test

Acceptance criteria

Result

Conclusion

Referance

Find below pages for complete protocol:

Key Parameter of Below Page:

Signature log

Find below pages for complete protocol:

Key Parameter of Below Page:

Deviation Report

Find below pages for complete protocol:

Key Parameter of Below Page:

Deviation Log

Find below pages for complete protocol:

Key Parameter of Below Page:

Revision History

Find below pages for complete protocol:

Share this article
Shareable URL
Prev Post

PERFORMANCE QUALIFICATION PROTOCOL FOR SEJONG 77 STATION DOUBLE ROTARY COMPRESSION MACHINE

Next Post

ACTIVITY QUALIFICATION PROTOCOL FOR CALCULATOR

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading