Your Compass for Pharma Success

PROCEDURE FOR BACKUP POWER

  • PROCEDURE:
  • When EB power fails, immediately start the DG set.
  • Check and ensure the Voltage, RPM, Frequency & Oil pressure.
  • Close the DG control panel ACB.
  • Close the DG incomer ACB in the power control center.
  • Concerned engineering personnel has to switch on the AHU’s, DHU’s, utility equipments and remaining loads.
  • When EB power resumes check and ensure the 3 Phase voltages should be in-between 415 – 420 Volts.
  • Intimate to the production in- charge for soft shut down of all the loads.
  • Open the DG incomer ACB in the PCC panel.
  • Close the EB incomer ACB in the PCC panel.
  • Open DG control panel ACB.
  • Stop the DG set after 5 minutes idle running.
  • Above mentioned EB power to DG power or DG power to EB power changeover procedure should be complete within 02 minutes only.
  • REFERENCES:
  •   Not Applicable
  • ANNEXURES: 
  •  Not Applicable
  • ENCLOSURES: SOP Training Record.
  • DISTRIBUTION:
  • Controlled Copy No. 01                     Head Quality Assurance
  • Controlled Copy No. 02                 Head-Engineering
  • Master Copy                           Quality Assurance Department
  • ABBREVIATIONS:
  • DG Set       :       Diesel Generator Set
  • ACB           :       Air circuit breaker
  • PCC           :       Power control center
  • RPM           :       Revolutions per minute
  • EB              :       Electricity board
  • AHU          :       Air handling unit
  • DHU          :       De-humidifier unit
  • SOP            :       Standard Operating Procedure
  • REVISION HISTORY:
  • CHANGE HISTORY LOG
Revision No.Details of Changes Reason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual
Share this article
Shareable URL
Prev Post

PROCEDURE FOR CALIBRATION OF DOSING PUMPS NaOCl, SMBS, ANTISCALENT AND NaOH

Next Post

PROCEDURE FOR AHU ON/OFF REQUEST

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

OPERATION OF ANEMOMETER

Revision No. Details of Changes  Reason for Change Effective Date 00 New SOP Not Applicable To be written manual

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading