Your Compass for Pharma Success

Cart

Remove item Thumbnail image Product Price Quantity Subtotal
× AUDIT COMPLIANCE REPORT FOR INADEQUATE LINE CLEARANCE BEFORE BATCH START IN GRANULATION AREA AUDIT COMPLIANCE REPORT FOR INADEQUATE LINE CLEARANCE BEFORE BATCH START IN GRANULATION AREA 70.00
70.00
× CHANGE CONTROL REPORT FOR INSTALLATION OF NEW FLUID BED DRYER (FBD) CHANGE CONTROL REPORT FOR INSTALLATION OF NEW FLUID BED DRYER (FBD) 24.00
48.00
× CHANGE CONTROL REPORT REPLACEMENT OF RAPID MIXER GRANULATOR (RMG) CHANGE CONTROL REPORT REPLACEMENT OF RAPID MIXER GRANULATOR (RMG) 18.00
36.00
× AUDIT COMPLIANCE REPORT USE OF EXPIRED RAW MATERIALS AUDIT COMPLIANCE REPORT USE OF EXPIRED RAW MATERIALS 70.00
70.00
× AUDIT COMPLIANCE REPORT FOR SOPs NOT REVISED PERIODICALLY AUDIT COMPLIANCE REPORT FOR SOPs NOT REVISED PERIODICALLY 70.00
70.00
× AUDIT COMPLIANCE REPORT FOR MISSING RAW MATERIAL IDENTIFICATION LABELS AUDIT COMPLIANCE REPORT FOR MISSING RAW MATERIAL IDENTIFICATION LABELS 70.00
70.00
× Investigation of Out of Specification Investigation of Out of Specification 9.00
9.00
× AUDIT COMPLIANCE REPORT FOR FAILURE TO PERFORM WEIGHING VERIFICATION AUDIT COMPLIANCE REPORT FOR FAILURE TO PERFORM WEIGHING VERIFICATION 60.00
60.00
× OPERATION AND CLEANING OF SAMPLING ROD OPERATION AND CLEANING OF SAMPLING ROD 9.00
9.00
× SOP ALLOCATION OF MANUFACTURING AND EXPIRY DATE SOP ALLOCATION OF MANUFACTURING AND EXPIRY DATE 9.00
9.00

Cart totals

Subtotal 451.00
Total 451.00