OPERATION OF COOLING TOWER

  • PROCEDURE:
  • Precautions:
  • Check the cooling tower water level which should be above half level, if need fill with softener water.
  • Ensure that the suction and delivery valves of cooling water pump are open.
  • Check the Main power supply is available.
  • Check for any abnormal noise in the fan, motor, drive shaft and gear reducer.
  • Starting Procedure:
  • Switch on the input power supply of the cooling tower pumps.
  • Start the cold water circulation pumps one by one based on plant load.
  • Start the cooling tower fans.
  • Record readings as per Annexure-I.
  •  Stopping Procedure:
  • Switch off the cold water circulation pumps.
  • Switch off the cooling tower fans.
  • Record readings as per enclosed Annexure-I.
  • REFERENCES:
  •    Not Applicable
  •    ANNEXURES: 
ANNEXURE NO.TITLE OF ANNEXURE
Annexure-ICooling tower Log Sheet
  • ENCLOSURES: SOP Training Record.
  •  DISTRIBUTION:
  • Controlled Copy No. 01  :          Head Quality Assurance
  • Controlled Copy No. 02  :            Head Engineering
  • Master Copy                    :          Quality Assurance Department
  • ABBREVIATIONS:
No.:Number
SOP:Standard Operating Procedure
SHE:Safety and health environment
AHU:Air Handling Unit
RC:Running Continually
  • REVISION HISTORY:             
  • CHANGE HISTORY LOG
Revision No.Details of ChangesReason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual

Annexure-I
COOLING TOWER LOG SHEET

COOLING TOWER LOG SHEET
Share this article
Shareable URL
Prev Post

OPERATION OF SMOKE GENERATOR

Next Post

OPERATION OF SOUND LEVEL METER

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

OPERATION OF ANEMOMETER

Revision No. Details of Changes  Reason for Change Effective Date 00 New SOP Not Applicable To be written manual

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading