Your Compass for Pharma Success

OPERATING PROCEDURE OF AIR SHOWER

  • OBJECTIVE:

To lay down a procedure for operating of Air Shower.

  • SCOPE:

This SOP is applicable for operating of Air Shower at {Company Name} {Company Location}.

  • RESPONSIBILITY:
  • Engineering Personnel is responsible for the operation of Air Shower.
  • Engineering Head / Designee is responsible for Compliance of SOP.
  • ACCOUNTABILITY:

Engineering Head

Head Quality Assurance

  • PROCEDURE:
  • PRECAUTION
  • Make sure that the operating personnel are wearing all the personal protective equipment & gowned properly.
  • Ensure that no powder is accumulated on PPE before exiting from the Air Shower.
  • ENTRY PROCEDURE
  • Wear the secondary gowning in the Change Room.
  • Press the Push Button, display shows GO then enter in to the Air Shower.
  • When door 1 is Open door 2 will be in closed conditionally.
  • Press the Emergency button to open the door 2 and enter into the Filter Cleaning Area
  • EXIT PROCEDURE
  • Press the Push Button of door 2 display shows GO then enter into the Air Shower.
  • When both doors get locked, after 5 seconds Blower starts automatically and runs up to the set time 40 sec.
  • After completion of the time cycle for air wash, the blower stops automatically,When the blower stop, after 5 seconds door 1 will open.
  • Exit from the Air Shower.
  • Remove the secondary gowning from the air lock room.
  • REFERENCES:

  Not Applicable

  • ANNEXURES: 

                 Not Applicable

ENCLOSURES: SOP Training Record.

  • DISTRIBUTION:
  • Controlled Copy No. 01                     Head Quality Assurance
  • Controlled Copy No. 02                 Head-Engineering
  • Master Copy                           Quality Assurance Department
  • ABBREVIATIONS:

PPE             : Personal Protective Equipment.

  • REVISION HISTORY:
                                                             CHANGE HISTORY LOG
Revision No.Details of Changes Reason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual
Share this article
Shareable URL
Prev Post

OPERATING PROCEDURE OF DG SET

Next Post

REDRESSING OF RAW MATERIALS AND PACKAGING MATERIALS IN WAREHOUSE

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading