CLEANING AND REPLACEMENT OF UV LAMPS

  • OBJECTIVE:

To lay down a procedure for cleaning procedure of UV Lamps.

  • SCOPE:

This SOP is applicable for cleaning procedure of UV Lamps at {Company Name} {Company Location}.

  • RESPONSIBILITY:
  • Technical Assistant – Engineering is responsible to perform the Cleaning procedure of UV lamps.
  • Executive/ Manager – Engineering is responsible to ensure the compliance as per SOP.
  • ACCOUNTABILITY:

Engineering Head

Head Quality Assurance

  • PROCEDURE:
  • Note down the intensity meter and hour meter reading in Annexure-I during cleaning activity.
  • Switch OFF the system, before starting the cleaning or replacement of UV Lamps.
  • CLEANING PROCEDURE OF UV SYSTEM
  • Close the feed pump inlet and outlet valves of UV chamber.
  • Remove the tubes (Quartz Glasses) from the chamber by unscrew the cap by rotating in anticlockwise direction.
  • Scrub the inner surface thoroughly with a soft nylon brush.Clean the UV chamber with purified water.
  • Re – fix the tubes (Quartz Glasses) in the chamber by screw the cap by rotating in clockwise direction.
  • Switch ON the UV system and check the intensity not less than the previous reading.
  • Record the cleaning details in as per the Annexure-I.
  • After completion of the cleaning, the label shall be updated on the UV lamps chamber as per Annexure-II.
  • FREQUENCY OF UV LAMPS CLEANING
  • UV lamps cleaning shall be carried out once in three months along with the quarterly preventive maintenance of purified water system.
  • REPLACEMENT PROCEDURE OF UV SYSTEM
  • Close the feed pump inlet and outlet valves of UV chamber.
  • Drain the water in the unit through drain valve.
  • Ensure that the correctly specified lamps are replaced at the time of replacement.
  • Remove the lamps from the chamber by unscrew the cap by rotating in an anticlockwise direction.
  • Take out the UV lamps from the chamber.
  • Replace all the O-rings.
  • Put the new lamp in housing and tighten the holders on both sides by Rotating clockwise direction.
  • Switch ON the power supply and check the load.
  • Open inlet and outlet valves of the feed pump of UV chamber.
  • Record the replacement details in as per Annexure-I.
  • Frequency of UV lamps replacement is as follows.
  • For RO UV system: If burning hour’s crosses9000 or intensity less than47.0 Watt/m2   whichever is earlier.
  • For Distribution UV system: If burning hour’s crosses12000 or intensity less than 41.0 Watt/m2 whichever is earlier.

Click the link to download word file copy of this document:
https://pharmaguidehub.com/product/cleaning-and-replacement-of-uv-lamps/

  • REFERENCES:

  Not Applicable

  • ANNEXURES: 
ANNEXURE No.TITLE OF ANNEXURE
Annexure-IUV lamp cleaning Record
Annexure-IILabel for UV Cleaning Details
Annexure-IIIUV Lamps Replacement Record

ENCLOSURES: SOP Training Record.

  • DISTRIBUTION:
  • Controlled Copy No. 01                     Head Quality Assurance
  • Controlled Copy No. 02                 Head-Engineering
  • Master Copy                           Quality Assurance Department
  • ABBREVIATIONS:

UV              :           Ultra Voilet.

RO              :           Reverse Osmosis.

  • REVISION HISTORY:
                                                             CHANGE HISTORY LOG
Revision No.Details of Changes Reason for ChangeEffective Date
00New SOPNot ApplicableTo be written manual

ANNEXURE-I
UV LAMP CLEANING RECORD

UV LAMP CLEANING RECORD

ANNEXURE-II
LABEL FOR UV CLEANING DETAILS

LABEL FOR UV CLEANING DETAILS

ANNEXURE-III
UV LAMPS REPLACEMENT RECORD

UV LAMPS REPLACEMENT RECORD

Click the link to download word file copy of this document:
https://pharmaguidehub.com/product/cleaning-and-replacement-of-uv-lamps/

Share this article
Shareable URL
Prev Post

CLEANING OF DYNAMIC AND STATIC PASS BOX

Next Post

CLEANING PROCEDURE FOR FILTERS

Leave a Reply

Your email address will not be published. Required fields are marked *

Read next

AHU PARAMETER MONITORING

To lay down a procedure for AHU Parameter monitoring. This SOP is applicable for AHU Parameter monitoring at…
AHU PARAMETER MONITORING

SOP FOR MOLYBDENUM TEST

The molybdenum test is a vital analytical procedure used to identify the presence of molybdenum in stainless…
SOP FOR MOLYBDENUM TEST

Discover more from PharmaGuideHub

Subscribe now to keep reading and get access to the full archive.

Continue reading